Skip to content

Appendix A — Supplier Care Sheets

The following supplier-issued care and warranty documents are bound into the printed version of this kit. Digital copies of each are kept with your handover pack archive.

  • Building Indemnity Insurance Certificate (QBE 600072570 BW1)
  • BII Acknowledgement Statement (signed at handover)
  • Electrical Certificate of Compliance
  • Plumbing Certificate of Compliance
  • Pool Fence Compliance Certificate
  • Termite Treatment Certificate
  • Certificate of Practical Completion
  • Statement of Compliance + Certificate of Occupancy
  • Kordon Termite Protection
  • B&D Statesman + Dynamic Door Service garage doors (service via All Style Garage Doors)
  • BAW Aluminium frameless shower screens
  • BAW Aluminium + G.James + Green Life aluminium windows
  • BlueScope Stratco Colorbond roofing (JLR Roofing registration)
  • Italia Ceramics porcelain tiles
  • The Pool Tile Company (Melbourne) pool tiles (CMC114, CMC115)
  • Cosentino benchtop systems
  • Tongue N Groove Freado Eterno engineered timber flooring
  • Stair Lock staircase
  • AUSPEX 25-year underfloor heating pipe + Eckermann installer warranty

Manufacturer Manuals (owner-supplied via Rawsons / Spartan)

Section titled “Manufacturer Manuals (owner-supplied via Rawsons / Spartan)”
  • Miele KS 7743 E refrigerator
  • Miele FNS 7794 E freezer
  • Miele K 31222 Ui under-bench fridge
  • Bosch HBG976MB1A oven (Series 8)
  • Bosch CSG958DB1 compact steam oven
  • Bosch PIV931HC1E induction cooktop
  • Bosch SBV8EDX01A dishwashers × 3
  • Falmec NRS 80 + Genova Plus 120 rangehoods
  • Franke Maris sinks + Soda Tap 5-IN-1
  • Artusi ABC1B bar fridge
  • Vintec V190BVC-BK wine fridge
  • BeefEater BSH158SA BBQ
  • BREMA CB249A-HCQ-DP ice maker (9 kg)
  • BREMA 25 kg ice maker
  • LG THERMA V R32 Monobloc heat pump (with Zennio Z35 thermostat manual)
  • Ezybreeze ducted AC commissioning report

Architect-Issued Documents (per Adam Fenton, Think Architects)

Section titled “Architect-Issued Documents (per Adam Fenton, Think Architects)”
  • Notice of Practical Completion (M4.1)
  • Defects Liability Period Information Sheet
  • Retention Release Schedule (C6.2a + C7)
  • Schedule of Defects at PC
  • Final Certificate (N11, at end of DLP)

Refer to the printed handover kit binder for the actual documents. This page is the index.